sbX Construction Alert for October 15-19

The sbX weekly construction update lists the places, dates, times and details of construction activity currently taking place in San Bernardino in preparation for the sbX bus rapid transit project.

Kendall Drive and Palm Avenue Park-and-Ride-Facility

  • Parameters: South of Kendall Drive and Palm Avenue intersection
  • Day Work: Mon. – Fri. from 7 a.m. to 4 p.m. daily
  • Specifics: Installation of lighting poles
  • LANE CLOSURE: No traffic control in effect

CSUSB

  • Parameters: New bus station location on campus
  • Day Work: Mon. – Fri. from 7 a.m. to 4 p.m. daily
  • Specifics: Landscaping activities
  • LANE CLOSURE: No traffic control in effect.

Marshall Blvd. Park-and-Ride Facility

  • Parameters: Northeast & northwest corners of E Street and Marshall Blvd.
  • Day Work: Mon. – Fri. from 7 a.m. to 4 p.m. daily
  • Specifics: Curb, bus pad and gutter work, electrical activities
  • LANE CLOSURE: Traffic control in effect

E Street

  • Parameters: Select locations between 10th Street and Hospitality Lane
  • Day Work: Mon. – Fri. 7 a.m. to 4 p.m. daily
  • Night Work: Mon. – Fri. from 9 p.m. to 7 a.m. nightly
  • Specifics: Driveway, curb, gutter and sidewalk work continues, including sidewalk removal between Church and 2nd Streets, traffic signal activities, electrical activities, landscaping activities.
  • Please note: On Monday, October 8, parking along the west side of E Street between 6th and 2nd Streets was eliminated to accommodate construction activities.
  • LANE CLOSURE: Traffic control in effect along E Street between 10th Street and Rialto Avenue.

 Hospitality Lane

  • Parameters: Select locations between E Street and Tippecanoe Avenue
  • Night Work: Mon. – Fri. from 10 p.m. to 7 a.m.
  • Intermittent Day Work
  • Specifics: Driveway, curb and gutter work continues,  electrical activities, street light activities, landscaping activities.
  • LANE CLOSURE: Traffic control in effect along Hospitality Lane between E Street and Tippecanoe Avenue.

 Various Bus Station Locations

  • Parameters: Little Mountain Drive, Shandin Hills Drive, Marshall Boulevard, Highland Avenue, Baseline Street
  • Day Work: Mon. – Fri. 7 a.m. to 4 p.m. daily
  • Night Work: Mon. – Fri. from 9 p.m. to 7 a.m. nightly
  • Specifics: Platform structure activities such as erecting structure steel and rebar placement. storm drain activities.
  • LANE CLOSURE: Traffic control in effect at some locations.
To establish a safe work environment for crews and the public, the construction crew has implemented traffic control measures that allow for at least one lane in each direction to be open during construction. Maintaining access to businesses is a high priority as part of this project. As such, signage is placed throughout the corridor to inform the public that they are open for business.


About sbX

The sbX Bus Rapid Transit (BRT) Project is the first-of-its kind express service to be constructed in the Inland Empire. It is the beginning of an intermodal public transit system in the San Bernardino Valley that will help reduce vehicle congestion while providing the public an environmentally friendly alternative that is sophisticated, cost effective, and time efficient.

The 15.7-mile corridor spans between northern San Bernardino and Loma Linda. It will include 16 art-inspired stations at key university, government, business, entertainment and medical centers as well as four park-and-ride facilities.

Visit the Omnitrans sbX Facebook page!
http://facebook.com/omnitrans.sbx

Leave a Reply